Project | Description of Work |
---|
South Perth Yacht Club | South Perth Yacht Club – Civils & Floating – Construct a land back wharf & 140 floating pen system |
CarnarvonYachtClub | Earthwork revetment and supply & install 22 floating pens and sheet pile land back wharf and concrete pile cap |
SharkBayResources | Stackerrail replacementandcyclone refugeproject |
Shire Carnarvon | Carnarvon Fascine Revitalisation Project stage 5 |
Onslow Salt Pty Ltd | 4W3 Bridge and flow control structure on main road |
Mingenew Shire | Mingenew-Mullewa Road culvert extension |
G & S Engineering | Tailings stacking facility – Karara mine site |
Golder Associates (BCI Nullagine) | Install and stabilize culverts 2100m. |
RCR | Sheet piling, pile driving, shed concrete columns |
Karara Mining | Warehouse facilities 1000cumt civil construction |
Cockburn Cement | Woodman Point demolition and replacement of jetty |
Dept of Transport | Port Denison Hard rock dredging |
Marble Bar | Complete fabrication and installation of War Memorial |
Shire of Dandaragan | Design and construct 200m precast concrete recreational jetty |
Shark Bay Resources | Civil construction of new warehouse 500m3 concrete |
Main Roads WA | Culvert extensions throughout Midwest region |
Mount Gibson M ining | Crusher ROM wall, and plant concrete civil 600 m3 concrete |
Cocos Keeling Island | 1500 m2 Land back Wharf and 250m precast, pile Bridge |
South of Perth Yacht Club | Land back Wharf 1200 m2 car park and Groyne work |
Iluka Resources | Civil works Nungarlu Processing plant 500 m3 concrete |
Como Engineers | Three Mile Hill gold mine refurbishment |
KT Sino Iron Project | Gas pipeline civil installation |
FM G Cloudbreak | Crusher ROM wall stabilisation |
Shire of Irwin | Construction of Dongara Recreational Centre |
DPI | Abrolhos Islands navigational aids Pelsaert Group |
TDRSS Facility M ingenew | Construct facilities for satellite installation |
FM G – Cloudbreak | Tilt panel retaining walls for ROM pads with stabilised fill |
Verve Energy | Coral Bay power station and wind farm civils |
AGC Industries | Civil works Challenge TAFE process plant training facility at Henderson |
Birla Nifty | 390,000m_ mine backfill |
Iluka Resources | Concrete civils at Waroona mine site |
Civmec | Stabilised backfill at Tom Price and Yandi. |
Indee Gold Project | Concrete civil construction works for new mine |
Emily Anne M ine | 25000 m3 mine backfill |
Mid West M ining | Concrete footings and walls for iron ore storage facility in Geraldton |
Roc Oil Dongara | Earthworks and 3000m3 concrete civil construction of oil storage and load out facility |
Iluka Resources Gingin | Civil construction for new mining plant |
Lion Ore Australia (Thunderbox) | Supply and lay concrete base slabs for camp and plant area |
Resort Marina, Maldives | Supply and construction of floating marina for holiday resort Maldives’ Islands |
Origin Energy | Civil supply and construction on oil field sites |
Bicton Baths Jetty | Demolition and reconstruction of stage one and two timber jetty reconstruction. |
Dampier Salt | Tilt slab retaining walls with stabilized back fill |
Halls Creek Shire | Construction of culvert crossing Tanami Desert |
Sydney Boat show | Construction and project management of temporary marina |
Alcoa mine site Pinjarra | Construction of crusher walls and stabilized back fill |
Sanctuary Cove Qld | Construction and maintenance of boat show marina |
South Perth Marine Facility | Stage 2 construction of new marina |
Emily Anne mine | 6000m3 mine shaft back fill |
Marina Construction Ballina NSW | Removal of old jetty and construction of floating marina. |
Tullering Peak Iron Ore | Concrete civil construction for crusher and supply grids |
Iluka Resources | Progressive civil and earth works at Eneabba mine site. |
Halls Creek Shire WA | Project management and Aboriginal training for concrete civil construction. |
Calm WA Penguin Island | Refurbishment and upgrading of public access walk ways. |
Iluka Resources | Haul Road floodway crossing and adjoining road works. |
Lion Ore | CAF backfill 12344 cubic metre and 5432 cubic metre continuous concrete pours. |