Carnarvon Yacht Club – Marina Development And Boat Pens Installation.

Incorporated into this project were also major works including;

Demolition of existing walkway and pile system, excavation of excess fill and removal of tyre wall of site approx. 3,500 m3.

Supply and install Pile type Az-14-770-10/10, 138.5 Lm @10 m in length.

Construction of a sheet pile wall located along the Fascine water frontage entrance to the marina to prevent erosion with concrete sheet pile cap.

Sheet pile tie back system @ every walkway into concrete pile cap 10 required.

Removal and excavation of sand spit inside the marina; 12,000 cubic meters of materials were excavated and then disposed of offsite.

Installation of 22 x Floating Pen System and piling. Walkway Pontoons, Finger Pontoons /floating platforms, with composite decking.

Earthworks and drainage,

Construction of new footpaths and walkways.

Installation of rock pitching inside the marina to protect the shoreline.

Recent Projects

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.