Irwin River Crossing

Irwin River Crossing

Incorporated into this project were also major works including;

Demolition of existing walkway and pile system, excavation of excess fill and removal of tyre wall of site approx. 3,500 m3.

Supply and install Pile type Az-14-770-10/10, 138.5 Lm @10 m in length.

Construction of a sheet pile wall located along the Fascine water frontage entrance to the marina to prevent erosion with concrete sheet pile cap.

Sheet pile tie back system @ every walkway into concrete pile cap 10 required.

Removal and excavation of sand spit inside the marina; 12,000 cubic meters of materials were excavated and then disposed of offsite.

Installation of 22 x Floating Pen System and piling. Walkway Pontoons, Finger Pontoons /floating platforms, with composite decking.

Earthworks and drainage,

Construction of new footpaths and walkways.

Installation of rock pitching inside the marina to protect the shoreline.

Woodman Point

Golder Associates P/l Bci

Marble Bar

Jurien Bay

South Of Perth Yacht Club

Cocos Island

Irwin Recreation Centre

Irwin Recreation Centre

The Irwin Recreation Centre project commenced in 2007 and was completed in 2008 comprising of indoor and outdoor sport facilities. The design of the Recreation Centre included extensive community consultation comprising workshops, briefing with the sporting and other user groups, Life Cycle calculations, and Grant Application. The New Recreational Centre incorporates the renovated existing sports building. The new sports hall provides international standard netball, basketball, volleyball and badminton courts. The changing facilities cater for both indoor and oval sport activities. The complex also provides tennis club facilities, function rooms with kitchens and rest rooms, Crèche, state of the art Gymnasium and Squash Courts.

The scope of works for the project was:

-Demolish part of the existing sports pavilion

-Complete final trim earthworks to level

-Form, fix and pour all concrete for the project

-Pour concrete tilt panels (on site).

-Lift tilt panels into place.

-Structural steel for the project

-Mechanical, electrical and plumbing

-Fit out (plastering, floor coverings, windows, carpentry, Brick work, painting and playground furniture)

 

More images from the Irwin Recreation Centre Project