| Project | Description of Work |
|---|
| South Perth Yacht Club | South Perth Yacht Club – Civils & Floating – Construct a land back wharf & 140 floating pen system |
| CarnarvonYachtClub | Earthwork revetment and supply & install 22 floating pens and sheet pile land back wharf and concrete pile cap |
| SharkBayResources | Stackerrail replacementandcyclone refugeproject |
| Shire Carnarvon | Carnarvon Fascine Revitalisation Project stage 5 |
| Onslow Salt Pty Ltd | 4W3 Bridge and flow control structure on main road |
| Mingenew Shire | Mingenew-Mullewa Road culvert extension |
| G & S Engineering | Tailings stacking facility – Karara mine site |
| Golder Associates (BCI Nullagine) | Install and stabilize culverts 2100m. |
| RCR | Sheet piling, pile driving, shed concrete columns |
| Karara Mining | Warehouse facilities 1000cumt civil construction |
| Cockburn Cement | Woodman Point demolition and replacement of jetty |
| Dept of Transport | Port Denison Hard rock dredging |
| Marble Bar | Complete fabrication and installation of War Memorial |
| Shire of Dandaragan | Design and construct 200m precast concrete recreational jetty |
| Shark Bay Resources | Civil construction of new warehouse 500m3 concrete |
| Main Roads WA | Culvert extensions throughout Midwest region |
| Mount Gibson M ining | Crusher ROM wall, and plant concrete civil 600 m3 concrete |
| Cocos Keeling Island | 1500 m2 Land back Wharf and 250m precast, pile Bridge |
| South of Perth Yacht Club | Land back Wharf 1200 m2 car park and Groyne work |
| Iluka Resources | Civil works Nungarlu Processing plant 500 m3 concrete |
| Como Engineers | Three Mile Hill gold mine refurbishment |
| KT Sino Iron Project | Gas pipeline civil installation |
| FM G Cloudbreak | Crusher ROM wall stabilisation |
| Shire of Irwin | Construction of Dongara Recreational Centre |
| DPI | Abrolhos Islands navigational aids Pelsaert Group |
| TDRSS Facility M ingenew | Construct facilities for satellite installation |
| FM G – Cloudbreak | Tilt panel retaining walls for ROM pads with stabilised fill |
| Verve Energy | Coral Bay power station and wind farm civils |
| AGC Industries | Civil works Challenge TAFE process plant training facility at Henderson |
| Birla Nifty | 390,000m_ mine backfill |
| Iluka Resources | Concrete civils at Waroona mine site |
| Civmec | Stabilised backfill at Tom Price and Yandi. |
| Indee Gold Project | Concrete civil construction works for new mine |
| Emily Anne M ine | 25000 m3 mine backfill |
| Mid West M ining | Concrete footings and walls for iron ore storage facility in Geraldton |
| Roc Oil Dongara | Earthworks and 3000m3 concrete civil construction of oil storage and load out facility |
| Iluka Resources Gingin | Civil construction for new mining plant |
| Lion Ore Australia (Thunderbox) | Supply and lay concrete base slabs for camp and plant area |
| Resort Marina, Maldives | Supply and construction of floating marina for holiday resort Maldives’ Islands |
| Origin Energy | Civil supply and construction on oil field sites |
| Bicton Baths Jetty | Demolition and reconstruction of stage one and two timber jetty reconstruction. |
| Dampier Salt | Tilt slab retaining walls with stabilized back fill |
| Halls Creek Shire | Construction of culvert crossing Tanami Desert |
| Sydney Boat show | Construction and project management of temporary marina |
| Alcoa mine site Pinjarra | Construction of crusher walls and stabilized back fill |
| Sanctuary Cove Qld | Construction and maintenance of boat show marina |
| South Perth Marine Facility | Stage 2 construction of new marina |
| Emily Anne mine | 6000m3 mine shaft back fill |
| Marina Construction Ballina NSW | Removal of old jetty and construction of floating marina. |
| Tullering Peak Iron Ore | Concrete civil construction for crusher and supply grids |
| Iluka Resources | Progressive civil and earth works at Eneabba mine site. |
| Halls Creek Shire WA | Project management and Aboriginal training for concrete civil construction. |
| Calm WA Penguin Island | Refurbishment and upgrading of public access walk ways. |
| Iluka Resources | Haul Road floodway crossing and adjoining road works. |
| Lion Ore | CAF backfill 12344 cubic metre and 5432 cubic metre continuous concrete pours. |