Significant Projects Completed
|
Project |
Description of Work |
|
South Perth Yacht Club |
South Perth Yacht Club - Civils & Floating – Construct a land back wharf & 140 floating pen system |
|
CarnarvonYachtClub |
Earthwork revetment and supply & install 22 floating pens and sheet pile land back wharf and concrete pile cap |
|
SharkBayResources |
Stackerrail replacementandcyclone refugeproject |
|
Shire Carnarvon |
Carnarvon Fascine Revitalisation Project stage 5 |
|
Onslow Salt Pty Ltd |
4W3 Bridge and flow control structure on main road |
|
Mingenew Shire |
Mingenew-Mullewa Road culvert extension |
|
G & S Engineering |
Tailings stacking facility – Karara mine site |
|
Golder Associates (BCI Nullagine) |
Install and stabilize culverts 2100m. |
|
RCR |
Sheet piling, pile driving, shed concrete columns |
|
Karara Mining |
Warehouse facilities 1000cumt civil construction |
|
Cockburn Cement |
Woodman Point demolition and replacement of jetty |
|
Dept of Transport |
Port Denison Hard rock dredging |
|
Marble Bar |
Complete fabrication and installation of War Memorial |
|
Shire of Dandaragan |
Design and construct 200m precast concrete recreational jetty |
|
Shark Bay Resources |
Civil construction of new warehouse 500m3 concrete |
|
Main Roads WA |
Culvert extensions throughout Midwest region |
|
Mount Gibson M ining |
Crusher ROM wall, and plant concrete civil 600 m3 concrete |
|
Cocos Keeling Island |
1500 m2 Land back Wharf and 250m precast, pile Bridge |
|
South of Perth Yacht Club |
Land back Wharf 1200 m2 car park and Groyne work |
|
Iluka Resources |
Civil works Nungarlu Processing plant 500 m3 concrete |
|
Como Engineers |
Three Mile Hill gold mine refurbishment |
|
KT Sino Iron Project |
Gas pipeline civil installation |
|
FM G Cloudbreak |
Crusher ROM wall stabilisation |
|
Shire of Irwin |
Construction of Dongara Recreational Centre |
|
DPI |
Abrolhos Islands navigational aids Pelsaert Group |
|
TDRSS Facility M ingenew |
Construct facilities for satellite installation |
|
FM G - Cloudbreak |
Tilt panel retaining walls for ROM pads with stabilised fill |
|
Verve Energy |
Coral Bay power station and wind farm civils |
|
AGC Industries |
Civil works Challenge TAFE process plant training facility at Henderson |
|
Birla Nifty |
390,000m_ mine backfill |
|
Iluka Resources |
Concrete civils at Waroona mine site |
|
Civmec |
Stabilised backfill at Tom Price and Yandi. |
|
Indee Gold Project |
Concrete civil construction works for new mine |
|
Emily Anne M ine |
25000 m3 mine backfill |
|
Mid West M ining |
Concrete footings and walls for iron ore storage facility in Geraldton |
|
Roc Oil Dongara |
Earthworks and 3000m3 concrete civil construction of oil storage and load out facility |
|
Iluka Resources Gingin |
Civil construction for new mining plant |
|
Lion Ore Australia (Thunderbox) |
Supply and lay concrete base slabs for camp and plant area |
|
Resort Marina, Maldives |
Supply and construction of floating marina for holiday resort Maldives’ Islands |
|
Origin Energy |
Civil supply and construction on oil field sites |
|
Bicton Baths Jetty |
Demolition and reconstruction of stage one and two timber jetty reconstruction. |
|
Dampier Salt |
Tilt slab retaining walls with stabilized back fill |
|
Halls Creek Shire |
Construction of culvert crossing Tanami Desert |
|
Sydney Boat show |
Construction and project management of temporary marina |
|
Alcoa mine site Pinjarra |
Construction of crusher walls and stabilized back fill |
|
Sanctuary Cove Qld |
Construction and maintenance of boat show marina |
|
South Perth Marine Facility |
Stage 2 construction of new marina |
|
Emily Anne mine |
6000m3 mine shaft back fill |
|
Marina Construction Ballina NSW |
Removal of old jetty and construction of floating marina. |
|
Tullering Peak Iron Ore |
Concrete civil construction for crusher and supply grids |
|
Iluka Resources |
Progressive civil and earth works at Eneabba mine site. |
|
Halls Creek Shire WA |
Project management and Aboriginal training for concrete civil construction. |
|
Calm WA Penguin Island |
Refurbishment and upgrading of public access walk ways. |
|
Iluka Resources |
Haul Road floodway crossing and adjoining road works. |
|
Lion Ore |
CAF backfill 12344 cubic metre and 5432 cubic metre continuous concrete pours. |